Monday, 16 December 2013

Filming day

This was third attempt at filming as the first two days were littered with problems. the first day we tried to film the weather was terrible and therefore i could only get limited footage. The second attempt of filming we had a problem with the lighting as the sun was low in the sky so again i could only get limited footage. The third day went much better as it was overcast so there was no problems with the lighting.

I managed to get all the shoots of the car that I needed. I also had the idea to film some shots sat inside the car as ponit of view shots. These shots were easy to film and will fit into the opening quite well. We had a twenty minute period where it was not possible to film anything as there was heavy rain. The only other problem I encountered was at one of the spots that we though would be quiet the traffic was much busier than expected. We managed to get some shots done there eventually.

No comments:

Post a Comment